Menu
Articles in this section
- Tech Note - LVL-01-CA - Versa-Lam® Allowable Prescriptive Hole
- Tech Note - LVL-02-CA - Versa-Stud® Allowable Nailing and Notching
- Tech Note - LVL-03-CA - Multiple ply Versa-Lam® Connections
- Tech Note - LVL-04-CA - Ripping Versa-Lam® LVL
- Tech Note - LVL-05-CA - Cupping of Versa-Lam® LVL
- Tech Note - LVL-06-CA - 2-ply Versa-Lam Headers Separated by a 1 ¾”(max.) Gap
- Tech Note - LVL-07-CA - Attachment of Brick Lintel to Versa-Lam® Beams
- Tech Note - LVL-08-CA - Multi-ply Connections for Versa-Stud® / Versa-Lam® Columns
- Tech Note - LVL-09-CA - Versa-Lam® Multiple Beam Concentrated Side Load Connections - Simpson SDW
- Tech Note - LVL-10-CA - Versa-Lam® Multiple Beam Side Load Connection - FlatLOK
Tech Note - LVL-10-CA - Versa-Lam® Multiple Beam Side Load Connection - FlatLOK
Related articles
- Tech Note - LVL-11-CA - Versa-Lam® 2.1E – 3100Fb: Solid Columns
- Tech Note - LVL-09-CA - Versa-Lam® Multiple Beam Concentrated Side Load Connections - Simpson SDW
- Tech Note - LVL-06-CA - 2-ply Versa-Lam Headers Separated by a 1 ¾”(max.) Gap
- BCI® & AJS® Flange Nailing Splits at Bearing Supports (US and Canada)
Comments
0 comments
Please sign in to leave a comment.